Overview
Work History
Skills
Timeline
Generic

Wilbert Torres Cortes

Loganville

Overview

6
6
years of professional experience

Work History

Electrician

IES ELECTRICAL
08.2024 - 05.2025

• Bend and run pipe from 3/4 to 3, rigid and EMT; install transformers and panels; terminations of transformers, panels, PDU, ATS, SWR; and installations of normal and emergency lights. • Installation of pipe and fire alarms, terminations of cable 500, installations of PVC, installation of cable tray and banquet tray, terminations of motor and air units, installation of 48-inch switches, installation of 18-inch receptacles, high and low voltage pull cable, bending and running aluminum pipe, trof installation, emergency door sensors, PDU installations, PDU terminations, ATS and SWR installations and terminations, run piping for units, installation of HR2- R2H panels, volt 208y- 120vac installation of lights, installation of 3/4 and 1 inch pipe, connections in three- phase lights380 and 400 volts, control terminations on motors, installations and termination of RPP, DU and installation of 4 inch pipes in chiler.

Electrician Lead Hand

Zachry Group
02.2021 - 01.2023

• Read blueprints, bend, and run pipe from 3/4 to 3. • install transformers and panels • terminations of transformers, panels • Installations of panels and terminations, RPP. • Installations of lights, outlets, switches, and 3-way switches. • Run cable for outlets, lights, switches, and GFCI. • Installations of cable trays, Kable Kontrol. • Installation of disconnect switch.

Electrician

Fluor Corporation Crystal River, FL
02.2019 - 01.2021

• Bend, and run the pipe from 3 to 3/4, and run PVC pipe for the ground cable. • Installation of a 4x4 box for outlets and data communication. • Run circuits for outlets, lights, and exit lights, 120-277 volts. AC unit, 220 volts • Connect wires in the unit.• Bend, and run the pipe from 3 to 3/4, and run PVC pipe for the ground cable. • Installation of a 4x4 box for outlets and data communication. • Run circuits for outlets, lights, and exit lights, 120-277 volts. AC unit, 220 volts • Connect wires in the unit.

Skills

  • Wiring installation
  • Electrical repairs
  • Electrical installation
  • Electrical troubleshooting

Timeline

Electrician

IES ELECTRICAL
08.2024 - 05.2025

Electrician Lead Hand

Zachry Group
02.2021 - 01.2023

Electrician

Fluor Corporation Crystal River, FL
02.2019 - 01.2021
Wilbert Torres Cortes