Summary
Overview
Work History
Education
Skills
Timeline
Generic

Grant Everette

Griffin

Summary

Detail-oriented construction professional with expertise in site safety management, project scheduling, and quality control. Proven ability to resolve conflicts and troubleshoot issues, ensuring efficient project execution.

Overview

11
11
years of professional experience

Work History

Construction Superintendent

Pro Construction of GA LLC
Macon
09.2025 - Current
  • Managed daily construction site operations, ensuring adherence to safety protocols.
  • Coordinated subcontractor activities, maintaining project schedules and workflows.
  • Supervised on-site laborers and tradespeople, guaranteeing quality workmanship.
  • Conducted inspections, identifying issues and implementing corrective actions efficiently.
  • Communicated updates to stakeholders, addressing concerns swiftly.
  • Organized logistics for materials and equipment to ensure efficient site management.
  • Collaborated with architects, engineers, and inspectors to facilitate the construction process.
  • Resolved conflicts among contractors, vendors, and owners promptly.

Steel Erection Foreman

SHJ Construction Group LLC
Thomaston
06.2022 - 09.2025
  • Supervised steel erection crews during construction projects.
  • Ensured compliance with safety protocols and regulations on-site.
  • Trained new team members on safety procedures and equipment use.
  • Assisted in interpreting blueprints and technical drawings for installations.
  • Conducted regular inspections of tools and equipment for safety standards.
  • Performed periodic reviews of employee performance evaluations in order to identify areas needing improvement or additional training.
  • Inspected completed structures for adherence to quality standards prior to final acceptance by customer or client.
  • Ensured that all tools, machinery and equipment were properly maintained in accordance with manufacturer's instructions.
  • Monitored progress of steel erection projects, ensuring that all deadlines were met on time and within budget.
  • Generated weekly reports documenting job status, cost projections, timelines and any changes from original plans.
  • Coordinated with other trades including carpenters, electricians and welders to ensure efficient project completion.
  • Communicated regularly with management about job progress and any changes that needed to be made.
  • Resolved issues between subcontractors in order to maintain positive working relationships while ensuring quality control standards were met.

Fabrication Manager

SHJ Construction Group LLC
Thomaston
11.2017 - 06.2022
  • Supervised fabrication processes to ensure quality and efficiency.
  • Managed team schedules and assigned tasks for optimal workflow.
  • Coordinated material sourcing to meet project specifications and timelines.
  • Implemented safety protocols to maintain a secure working environment.
  • Trained new employees on equipment operation and fabrication techniques.
  • Oversaw inventory management to ensure availability of necessary supplies.
  • Collaborated with engineering teams to interpret design specifications accurately.
  • Conducted regular inspections of fabricated materials for compliance standards.

Ironworker

Zachry Industrial
Juliette
10.2014 - 11.2017
  • Fabricated and assembled structural steel components for various construction projects.
  • Installed beams, columns, and metal decking according to project specifications.
  • Operated cranes and hoisting equipment to lift heavy materials safely.
  • Collaborated with team members to ensure timely completion of tasks.
  • Interpreted blueprints and technical drawings for accurate construction implementation.
  • Maintained tools and equipment in good working condition for safety compliance.
  • Loaded and unloaded trucks with tools and supplies needed for job sites.
  • Cut material with shears, hand torches, plasma cutters, or power saws.

Education

High School Diploma -

Excel High School
Excel, AL
05-2012

Skills

  • Construction management
  • Site safety management
  • Project scheduling
  • Quality control
  • Conflict resolution
  • Troubleshooting issues
  • Time management
  • Critical thinking
  • Building codes compliance
  • Subcontractor coordination
  • Material take offs and estimates
  • Blueprints

Timeline

Construction Superintendent

Pro Construction of GA LLC
09.2025 - Current

Steel Erection Foreman

SHJ Construction Group LLC
06.2022 - 09.2025

Fabrication Manager

SHJ Construction Group LLC
11.2017 - 06.2022

Ironworker

Zachry Industrial
10.2014 - 11.2017

High School Diploma -

Excel High School
Grant Everette