-Bellwood Quarry (Atlanta GA) 2016-2020
- Haul Truck Operations (loading haul trucks with excavator/driving and dumping haul trucks)
- TBM Building, Operations And Maintenance
- TBM Drill Operator (drilling & installing ground support (types 1, 2 & 3))
- Probe drilling (500ft+)
- Locomotive Operations (transporting material, tools, and personnel)
- Change Cutters (5 miles)
- Tie Rebar to specs
- Build rail and install ties
- Build and/or install/uninstall wooden forms @ addits 1, 2 & 3
- Build and move “switch” through the tunnel
- Move & Set Metal Tunnel Forms (4 miles)
- Grout Tunnel(5 miles) +Chemical Grout @ all bulkheads
-Shaft 1 and 2 (Bellwood Quarry
- TunnelPoint and Patch any Holes Or Cracks
- Install lift gate for water control
- Install beams and lid
Atlanta Airport Plane Train Extension 2020-2024
- Excavate @ main shaft down to rock
- Drill and shoot
- Muck out shaft with excavator
-Shafts 1,2 & 3 (inside atl airport)
-Separate shafts, same order of operations
- Build and install gantry crane
- Excavate shaft (50-60 ft)
- Weld T beams to support structure and install ground support (metal beams and lagging)
- Grout shafts (nozzle man/pump operator)
- Assist with waterproofing shafts
Difference in Shaft three is it connects to the tunnel therefore rebar and shotcrete was involved
- Maintain Water Treatment plant
- Tie Rebar to specs
- Build, Set & Strip Forms (T.C.E Shaft, Vent Culvert, Egress, Extension Tunnel, Sidewalk, Running Beams etc.) pour and finish concrete to specs
- Install beam and shaft lid
- Install backing rod and grout @ shaft lid
- Demobilize site
- Escort Key Personnel, Vehicles & Material Into Secure Areas Inside Airport (S.I.D.A Training)
- Complete Daily Organized Paperwork Such As Time Sheets, T.R.A.C.K Forms, Hot Work Permits, Fire Watch (AATC), Escort Forms (DOA)
- Lead T.R.A.C.K & Daily POD Meetings
- Ensure Material Needed For Task At Hand Is Present
- Delegate Crew Members To Different Tasks
- Ensure All Safety Protocols Are Followed And Proper PPE Is Issued And Tracked Per Task At Hand.
Fort Laramie, Wyoming (March 2024-May 2024)
-Exploration of UCRS tunnels 1&2 from 1917
- Jackleg holes at crown, ribs and invert
- Install packers in bad or thin ground
- Patch holes in good ground
- Core drill 4” holes at invert and 2” holes at crown and ribs. Take and store samples accordingly. Time and station stamps on each core
- Grout tunnel until each packer has communicated
- Demobilize and stage site for future endeavors
-Dallas Georgia (2024-current)
-replace batteries, fluids, brakes, bearings, filters, seals, wheels, tracks, hoses etcFix and maintain all equipment
- Test all equipment
- Take and keep track of inventory
- Load and ship equipment and tools onto semi to different states (Virginia, Baltimore)
- Cut and crimp high pressure hydraulic hoses
- Build blast Matt’s